|
With tube in vertical position:
- Center REDIBASE over tube
- Push REDIBASE down over tube to ground
- Lift tube to allow flap side tabs to snap under tube bottom
- Snug tube down into side tabs and apply 4 - 5 passes of duct tape
(8 - 10 feet tape per footing)
For 12" tubes, score and snap every 2nd flap (it doesnt matter if they break off) then follow above procedure.
For extra long lengths of tube
- Hold tube between knees
at an angle to the ground
- Center REDIBASE with bottom
edge of tube top
- Pull REDIBASE up and over
tube with swift motion.
Extreme cold: Apply heat to unit to soften plastic.
(in field, vehicle exhaust can be used)
|
 |
 |